Chattahoochee Pump Station and Pipeline

Client: Dekalb County Department of Public Works

Metcalf & Eddy is designing a 300-mgd replacement raw-water pumping station for the Scott Candler water filtration plant in DeKalb County, Georgia, to help meet long-range water supply needs.

 

Metcalf & Eddy is replacing the old pump station with a new upgraded facility downstream from the original site.  M&E developed a plan for a new intake at the river bank and is designing sand removal wells ahead of the fine screens at the structure.  The old mid-channel intake and rock weir will be removed from the river.  Six vertical turbine pumps, each with a capacity of 60 mgd, will provide a firm capacity of 300 mgd, adequate to run the station during off-peak hours for optimum electrical costs. 

 

Metcalf & Eddy is also designing 13,000 feet of new 96-inch diameter raw water transmission main to the Scott Candler Water Plant reservoirs.  The new main will replace a 48-inch main that has been subject to repeated failures.

 

M&E services include:

  • Preliminary and detailed design
  • Permitting
  • Easement acquisition
  • Construction services
   
   
 